

INDESTRUCTIBLE
Our modular plastic formwork system for interior and exterior walls offers optimal protection of the concrete through PVC shell.

Fermentation is highly corrosive.
concrete sealants/
Coatings are expensive.
CORROSION

Cracks in concrete lead to dangerous gas leaks and loss of profits
CRACK FORMATION

FormProtect prevents corrosion and cracking from endangering your system.
FORMPROTECT
No more corrosion of the concrete as it is completely protected. Concrete and weather protection is built in directly.
No additional coating inside and cladding outside necessary
The reinforced concrete container. The interlocking PVC modules provide a solid and stable connection.
The result is a very pressure-resistant and rigid component in reinforced concrete composite construction. The high
Bending stiffness of the shell also allows the absorption of moments, for example from
earth pressure loads, which provides a high level of safety against earthquakes.
It can't dry out!
Up to water column of 47 m
protection against chemical attacks
We can install the wall insulation immediately if required
– so it cannot become damp - the same applies to the ground (foundation).
up to 2 hours
The plastic bowls are impact and shock resistant, rot-resistant and food safe.
The new formwork system gives the building a lasting aesthetic and perfect design.
The container looks immediately finished and looks modern
The double-sided protection of the steel construction gives the container a consistent
Durability and an exceptionally long service life.
FormProtect is a multifunctional system and can be used universally
You save time and money and build highly efficiently and sustainably through:
No more formwork removal necessary
No coating inside the gas area: saves work, expensive epoxy resin coating and expensive waiting time in bad weather
Wall ducts installed ready for connection, thus shortening installation time
External cladding is not required, as the formwork (pearl white) is also the cladding
Significantly shortened construction time – this means that biogas plants can be connected to the gas network earlier

EXPERIENCE
Frank Barthelmeß
Germany
"In 2020, we built two fermenters measuring 13 x 6 m and 19 x 8 m with the FormProtect system. M+B Betonbau completely erected the two tanks in a very short time. The very short construction time of only 3 months - from excavation to going online - convinced us."
rating
Stan Weyns
Sweden
"With agriKomp, we have successfully implemented many projects in a short period of time in 2023 - 2024. We used the FormProtect main and post digesters facilities everywhere. The short construction time and high quality convinced us and we will also use them in future projects!"
rating
Lauri Ylä-Ajos
Finland
"In 2024, we were able to build our first 22 x 6 m biogas fermenter from FormProtect in Finland. The assembly team from M+B Betonbau came to us with two supervisor fitters and built a high-quality container in a short time. Of course, we organized steel, concrete, crane and assistants on site and were thus able to guarantee a smooth process."
rating
0
PROJECTS
COMPLETED
0
CONTAINERS
ESTABLISHED
0