top of page
cover01.jpg

Simply the best
concrete tank

background.jpg

INDESTRUCTIBLE

Our modular plastic formwork system for interior and exterior walls offers optimal protection of the concrete through PVC shell.

01.jpg

Fermentation is highly corrosive.

concrete sealants/

Coatings are expensive.

CORROSION

02.jpg

Cracks in concrete lead to dangerous gas leaks and loss of profits

CRACK FORMATION

03.jpg

FormProtect prevents corrosion and cracking from endangering your system.

FORMPROTECT

UNBEATABLE BENEFITS

  • No more corrosion of the concrete as it is completely protected. Concrete and weather protection is built in directly.

  • No additional coating inside and cladding outside necessary

  • The reinforced concrete container. The interlocking PVC modules provide a solid and stable connection.

    The result is a very pressure-resistant and rigid component in reinforced concrete composite construction. The high

    Bending stiffness of the shell also allows the absorption of moments, for example from

    earth pressure loads, which provides a high level of safety against earthquakes.

  • It can't dry out!

  • Up to water column of 47 m

  • protection against chemical attacks

  • We can install the wall insulation immediately if required

    – so it cannot become damp - the same applies to the ground (foundation).

  • up to 2 hours

  • The plastic bowls are impact and shock resistant, rot-resistant and food safe.

  • The new formwork system gives the building a lasting aesthetic and perfect design.

  • The container looks immediately finished and looks modern

  • The double-sided protection of the steel construction gives the container a consistent

    Durability and an exceptionally long service life.

  • FormProtect is a multifunctional system and can be used universally

  • You save time and money and build highly efficiently and sustainably through:

    1. No more formwork removal necessary

    2. No coating inside the gas area: saves work, expensive epoxy resin coating and expensive waiting time in bad weather

    3. Wall ducts installed ready for connection, thus shortening installation time

    4. External cladding is not required, as the formwork (pearl white) is also the cladding

    5. Significantly shortened construction time – this means that biogas plants can be connected to the gas network earlier

Request a brochure

interest
green-wheat-spikes-in-a-field-with-trees-on-the-ba-2025-02-11-18-02-10-utc.jpg

EXPERIENCE

Frank Barthelmeß

Germany

"In 2020, we built two fermenters measuring 13 x 6 m and 19 x 8 m with the FormProtect system. M+B Betonbau completely erected the two tanks in a very short time. The very short construction time of only 3 months - from excavation to going online - convinced us."

rating

Stan Weyns

Sweden

"With agriKomp, we have successfully implemented many projects in a short period of time in 2023 - 2024. We used the FormProtect main and  post digesters facilities everywhere. The short construction time and high quality convinced us and we will also use them in future projects!"

rating

Lauri Ylä-Ajos

Finland

"In 2024, we were able to build our first 22 x 6 m biogas fermenter from FormProtect in Finland. The assembly team from M+B Betonbau came to us with two supervisor fitters and built a high-quality container in a short time. Of course, we organized steel, concrete, crane and assistants on site and were thus able to guarantee a smooth process."

rating

CONTACT

Kontakt.jpg
  • Instagram
  • Facebook
  • LinkedIn

CONTACT US

0

PROJECTS
COMPLETED

0

CONTAINERS
ESTABLISHED

0

YEARS
EXPERIENCE

bottom of page